February 05, 2021
Tactical Action - Use the appropriate extinguishing method, media, techniques and equipment
Updated title
February 03, 2021
Tactical Action - Develop and organise a water/media management strategy or nominate a water officer
Formatting issue corrected - additional spaces
February 01, 2021
Hazard - Fire and thermal radiation
Link to HSE document removed Electrical transformers
Control measure - Site-Specific Risk Information (SSRI)
Hyperlink to environmental protection handbook updated. - No change
January 27, 2021
Control measure - Respiratory protective equipment
Link added to BA foundation
January 26, 2021
Control measure - Personal protective equipment
Formatting revised
January 21, 2021
Control measure - Operational learning
Hyperlinks added
Hazard - Compromised investigations and scene preservation: Fires
Replaced operational learning control measure with Corporate Guidance operational learning control measure
December 04, 2020
Introduction
Removal of acronym
November 27, 2020
Control measure - Preserve evidence for investigation
Training specification link updated
Control measure - Secure the scene for investigation
Training specification link updated
November 13, 2020
Responsibility of fire and rescue services
September 22, 2020
Tactical Action - Record all relevant incident information in an appropriate format
Control measure - Preserve evidence for investigation
Tactical Actions added or removed
Tactical Action - Notify investigators if personnel have recently attended similar incidents, which could result in cross-contamination of an investigation scene
Revised wording
Control measure - Secure the scene for investigation
Revised content
Tactical Action - Inform all personnel of known or likely areas of interest for fire or criminal investigation, so that these can be avoided
Additional text added to the end
September 21, 2020
Control measure - Respiratory protective equipment
Link added to BA foundation
Strategic Action - Specify the type of RPE required for hazards identified through risk assessments and communicate this information to personnel
Revised wording
Strategic Action - Provide personnel with suitable and appropriate RPE that fits and protects the wearer
Revised wording
Strategic Action - Provide appropriate accommodation (storage) for PPE when it is not being used
Minor change - Revised wording
Control measure - Personal protective equipment
September 18, 2020
Control measure - Closed-circuit television
Revised control measure knowledge and new strategic and tactical actions
July 28, 2020
Strategic Action - Ensure information about available fire and rescue service specialist resources is made available to relevant personnel
July 03, 2020
Strategic Action - Keep accurate records of the agencies and individuals involved in the investigation
Strategic Action - Develop a joint understanding with other emergency services and agencies regarding the actions required ...
Tactical Action - Ensure that personnel have access to the appropriate PPE
Tactical Action - Identify when dirt, contamination or damage may affect the performance of PPE
October 08, 2019
Control measure - High volume pump hose deployment
Minor amendment - Abbreviation expanded and case changed of Police and local authority approved by M Hodges
July 24, 2019
Control measure - Site-Specific Risk Information (SSRI)
Tactical action had been changed incorrectly by M Hodges during upload of Transport guidance, tactical action overwritten. Error corrected and new content created for transport Approved by M Hodges
July 19, 2019
Responsibility of fire and rescue services
Minor amendment - reference to transport incidents rather than incidents amended. Approved by M Hodges
July 10, 2019
Responsibility of fire and rescue services
Minor amendment - duplicated to removed Approved by M Hodges
July 09, 2019
Control measure - Operational learning
Minor amendment. Removed comma Approved by Mark Hodges.
July 05, 2019
Control measure - Select an appropriate firefighting method
Minor amendment formatting - Approved by M Hodges
July 01, 2019
Control measure - Site-Specific Risk Information (SSRI)
Tactical action had been changed incorrectly by M Hodges during upload of Transport guidance, tactical action overwritten. Error corrected and new content created for transport Approved by M Hodges
May 09, 2019
Strategic Action - Develop SSRI for aerodromes
May 08, 2019
Control measure - Operational learning
Control measure - Incident Handover
Strategic Action - Develop Site-Specific Risk Information (SSRI) for aerodromes
Tactical Action - Refer to the SSRI for the aerodrome
May 02, 2019
Strategic Action - Develop SSRI for aerodromes.
Tactical Action - Refer to the SSRI for the aerodrome.
Strategic Action - Develop criteria for the identification of sites requiring Site-Specific Risk Information
May 01, 2019
Control measure - Preserve evidence and support investigation
Record keeping link updated
April 25, 2019
Control measure - Preserve evidence and support investigation: Transport incidents
Record keeping link updated
February 18, 2019
Strategic Action - During fire safety inspections, gather information about fixed installations and building systems installed and ensure they function appropriately
All changes made following review requested by National Operational Learning. Changes made by panel of SME’s following review of available literature and approved by NFCC Steering Group on the 13th of February 2019.
February 13, 2019
Hazard - Compromised investigations and scene preservation: Fires
Training spec link updated for Powers of Entry CM.
Fires and Firefighting
Training spec link updated for Powers of Entry CM.
February 05, 2019
Control measure - Written reports
Minor amendment. Approved by M Hodges.
February 04, 2019
Control measure - Written reports
This mornings content wording updated rescinded. Wording back to previous. Training Spec link added.