Skip to main content

Developed and maintained by the NFCC

February 08, 2021

Hazard - Fire water run-off

Site-specific risk information and Emergency response plan control measures updated as part of Review of Operations 3rd edition - knock on impact removal from hazards in other pieces of guidance


February 01, 2021

Control measure - Site-Specific Risk Information (SSRI)

Hyperlink to environmental protection handbook updated. - No change


January 27, 2021

Control measure - Respiratory protective equipment

Link added to BA foundation


September 21, 2020

Control measure - Respiratory protective equipment

Link added to BA foundation

Control measure - Respiratory protective equipment

Strategic and tactical actions amended

Strategic Action - Specify the type of RPE required for hazards identified through risk assessments and communicate this information to personnel

Revised wording

Strategic Action - Provide personnel with suitable and appropriate RPE that fits and protects the wearer

Revised wording


July 09, 2020

Hazard - Inaccurate situational awareness: On board vessels


July 08, 2020

Fires on board vessels


July 03, 2020

Responsibility of fire and rescue services


June 29, 2020

Control measure - Respiratory protective equipment


February 19, 2020

Fires on board vessels


July 24, 2019

Control measure - Site-Specific Risk Information (SSRI)

Tactical action had been changed incorrectly by M Hodges during upload of Transport guidance, tactical action overwritten. Error corrected and new content created for transport Approved by M Hodges


July 19, 2019

Responsibility of fire and rescue services

Minor amendment - reference to transport incidents rather than incidents amended. Approved by M Hodges


July 10, 2019

Responsibility of fire and rescue services

Minor amendment - duplicated to removed Approved by M Hodges


July 05, 2019

Control measure - Select an appropriate firefighting method

Minor amendment formatting - Approved by M Hodges


July 01, 2019

Control measure - Site-Specific Risk Information (SSRI)

Tactical action had been changed incorrectly by M Hodges during upload of Transport guidance, tactical action overwritten. Error corrected and new content created for transport Approved by M Hodges


May 10, 2019

Strategic Action - Provide a recording system that supports boarding control and emergency evacuation at incidents involving vessels

Control measure - Boarding control procedures


May 09, 2019

Strategic Action - Develop SSRI for aerodromes


May 08, 2019

Strategic Action - Develop Site-Specific Risk Information (SSRI) for aerodromes

Tactical Action - Refer to the SSRI for the aerodrome


May 02, 2019

Strategic Action - Develop SSRI for aerodromes.

Strategic Action - Develop criteria for the identification of sites requiring Site-Specific Risk Information

Tactical Action - Refer to the SSRI for the aerodrome.


April 30, 2019

Hazard - Inaccurate situational awareness: On board vessels

Changes made following periodic full document review. Changes approved by steering group 08/04/2019.

Fires on board vessels

Changes made following periodic full document review of Transport guidance. Changes approved by steering group 08/04/2019.


February 04, 2019

Control measure - Avoid smoke plumes

NOG guidance link corrected.


October 09, 2018

Tactical Action - Ensure that a scene survey is carried out at the earliest opportunity

See tactical action - 12589 Ensure that a full scene survey is carried out at the earliest opportunity to gain sensory perception of the current situation and hazards present - ICS


September 04, 2018

Strategic Action - Ensure that personal RPE worn simultaneously is compatible and does not negatively impact other safety measures

Strategic Action - Provide employees with suitable RPE that fits the wearer correctly and adequately controls identified risks

Tactical Action - Ensure that all personnel wear the type of RPE identified by service risk assessments, procedures and training

Strategic Action - Provide employees with suitable RPE that fits the wearer correctly and adequately controls identified risks

Strategic Action - Ensure that personal RPE worn simultaneously is compatible and does not negatively impact other safety measures

Strategic Action - Specify the type of RPE required for hazards identified through risk assessment and communicate to personnel

Strategic Action - Specify the type of RPE required for hazards identified through risk assessment and communicate to personnel

Tactical Action - Ensure that all personnel wear the type of RPE identified by service risk assessments, procedures and training


August 22, 2018

Introduction

Ocean-going changed to sea-going


August 16, 2018

Control measure - Respiratory protective equipment (RPE)

Control measure - Respiratory protective equipment (RPE)

Control measure - Avoid smoke plumes

Archived Tactical action replaces


August 08, 2018

Hazard - Uncontrolled ventilation

Captions fixed


July 10, 2018

Responsibility of fire and rescue services

Number changed to superscript


July 09, 2018

Hazard - Insufficient resources: On board vessels

Document signifier updated

Control measure - Liaise with the officer of the day or contract manager

Document signifier updated

Control measure - Boarding control procedures

Document signifier updated


July 04, 2018

Hazard - Uncontrolled ventilation

'force-draft' changed to 'forced draught' and hyphen removed from 'force-vented'


June 18, 2018

Hazard - Military vessels

Inverted commas removed from 'stand by'. 'In' added before 'attendance'.


June 12, 2018

Control measure - Thermal imaging or scanning

infra-red changed to 'infrared'

Control measure - Consider employing tactical ventilation

'information-gathering' changing 'information gathering'