Skip to main content

Developed and maintained
by the NFCC

November 29, 2021

Control measure - Consider business continuity arrangements

Changes made following document review, approved 5/11/2019 Steering group


June 14, 2021

Control measure - Safe system of work: Non-ionising radiation

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021

Control measure - Safe system of work: Non-ionising radiation

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021

Control measure - Safe system of work: Electromagnetic fields

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021

Control measure - Safe system of work: Electromagnetic fields

No change of meaning - duplicated paragraph removed.

Control measure - Safe system of work: Electromagnetic fields

No change of meaning - duplicated paragraph removed.

Tactical Action - Consider the impact of electromagnetic fields (EMFs) on fire and rescue service communications and remotely operated equipment

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021

Tactical Action - Ensure personnel entering the hazard area do not have any medical implants that may be affected by sources of non-ionising radiation

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021

Tactical Action - Ensure that all personnel are made aware of the presence of non-ionising radiation

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021

Strategic Action - Consider using joint on-site training to gain familiarisation about sources of non-ionising radiation

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021

Strategic Action - Inform personnel about the hazard of exposure to non-ionising radiation, especially if they have medical implants that may be affected

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021

Hazard - Non-ionising radiation

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021

Hazard - Non-ionising radiation

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021

Hazard - Non-ionising radiation

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021


May 26, 2021

Control measure - Safe system of work: Atmospheric conditions

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021. Content from: Carry out atmospheric testing and monitoring Provide ventilation Isolate or limit gases, liquids and other flowing materials


May 25, 2021

Control measure - Safe system of work: Atmospheric conditions - HSC

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021. Content from: Carry out atmospheric testing and monitoring Provide ventilation Isolate or limit gases, liquids and other flowing materials

Control measure - Safe system of work: Atmospheric conditions - HSC

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021. Content from: Carry out atmospheric testing and monitoring Provide ventilation Isolate or limit gases, liquids and other flowing materials

Tactical Action - Consider requesting specialist advice or assistance for atmospheric detection, identification and monitoring

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021

Tactical Action - Carry out testing and monitoring of the atmosphere and use the results to inform the incident plan

No change following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021

Strategic Action - Enable access to suitable atmospheric monitoring equipment that can be used for multiple applications

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021


January 18, 2021

Hazard - Slurry pits and lagoons

Changes made following document review, approved 5/11/2019 Steering group not implemented on site. Content updated 18/01/21 to reflect changes

Control measure - Identify and control the hazard area around a slurry pit or lagoon

No change - Hyperlink updated

Hazard - Silos and storage tanks

Formatting change - Hyperlink updated

Hazard - Pressure systems and equipment

Formatting change - capitalization

Control measure - Safe system of work: Electromagnetic fields

No change of meaning - duplicated paragraph removed.

Industry


January 14, 2021

Control measure - Safe system of work: Laser equipment at industrial sites

Hazard - Extreme cold

No change - minor amendment Hyperlink fixed. Formatting amended

Control measure - Safe system of work: Extreme heat at industrial sites

Minor amendment - Crew changed to personnel to match style guide

Tactical Action - Closely supervise personnel and implement appropriate rotation of personnel for those working in extreme heat

Minor amendment - Crew changed to personnel to match style guide

Hazard - Places of lawful detention

Missing hyperlinks fixed.

Hazard - Stacked materials

Minor change - document unavailable as information now requires membership. Text and link updated.

Control measure - Specialist advice: Scaffolding

Missing bullet point added


January 13, 2021

Hazard - Temporary structures and temporary accommodation units

No significant change. Formatting changes and language changes - no change of meaning approved by MH


January 12, 2021

Control measure - Identify and control hazard areas

No significant change Hyperlink updated

Industry

Hazard - Incidents in industry

Reference to removed hazard combustible dust removed


January 08, 2021

Hazard - Incidents in industry

Changes made following document review, approved 5/11/2019 Steering group

Control measure - Situational awareness: Industry

Links to SSRI and emergency response plans updated.

Industry

Proof read of document - Linking updated


November 24, 2020

Control measure - Access and egress: Scaffolding

No Change formatting amended

Hazard - Scaffolding


November 04, 2020

Hazard - Silos and storage tanks

Incorrect spelling. Changed backdraft to backdraught


July 22, 2020

Responsibility of fire and rescue services


December 17, 2019

Control measure - Identify and control the hazard area around munitions

Hazard - Pressure systems and equipment

Changes made following document review, approved 5/11/2019 Steering group

Hazard - Places of lawful detention

Changes made following document review, approved 5/11/2019 Steering group


December 13, 2019

Tactical Action - Ensure personnel  wear appropriate hearing protection and high-visibility clothing when entering the hazard area

Tactical Action - Take action to protect or remove fireworks at risk from fire

Tactical Action - Liaise with the responsible person to identify the type, quantity and location of any fireworks present