Skip to main content

September 13, 2019

Control measure - Evacuation and shelter

Control measure - Evacuation and shelter

Control measure - Emergency response plans


September 12, 2019

Control measure - Respiratory protective equipment (RPE)

Control measure - Site-Specific Risk Information (SSRI)

Control measure - Emergency response plans

Control measure - Cutting away

Control measure - Respiratory protective equipment (RPE)

Control measure - Site-Specific Risk Information (SSRI)

Control measure - Site-Specific Risk Information (SSRI)

Fires in buildings

Control measure - Evacuation and shelter


September 11, 2019

Control measure - Evacuation and shelter


September 10, 2019

Control measure - Appropriate speed and weight of intervention

Control measure - Take preventative action

Control measure - Identify appropriate access and egress points

Control measure - Assess the building for signs of collapse

Hazard title more appropriate and in line with NOG style.

Control measure - Identify the presence of lightweight or fragile building features


August 30, 2019

Control measure - Respiratory protective equipment (RPE)


August 29, 2019

Control measure - Evacuation and shelter

Control measure - Respiratory protective equipment (RPE)

Control measure - Emergency response plans

Control measure - Site-Specific Risk Information (SSRI)


August 28, 2019

Control measure - Controlled burning


August 16, 2019

Control measure - Firebreaks and fuel breaks


August 06, 2019

Control measure - Use integral communications

Control measure - Implement firefighting contingency arrangements

Control measure - Apply situational awareness: Fires in buildings

Control measure - Responsible person: Fires in buildings

Control measure - Appropriate intervention: Fires in auditoriums and stadiums

Control measure - Appropriate intervention: Fires in atriums

Control measure - Appropriate intervention: Fires in building with an open plan layout

Control measure - Access concealed spaces

All changes made following review requested by National Operational Learning. Changes made by panel of SME’s following review of available literature and approved by NFCC Steering Group on the 13th of February 2019.

Control measure - Appropriate intervention: Mezzanine, gallery or raised storage area

Control measure - Appropriate intervention: Fire in tunnel

Control measure - Appropriate intervention: Fires in basements

Control measure - Safe access and egress: Fires in buildings

Control measure - Appropriate intervention: Fires in tall buildings

All changes made following review requested by National Operational Learning. Changes made by panel of SME’s following review of available literature and approved by NFCC Steering Group on the 13th of February 2019.

Control measure - Remove materials

Control measure - Identify hoarding properties

Control measure - Appropriate intervention: Fires in chimneys

Control measure - Tactical planning – Damage control

Control measure - Damage control – Thatch fires

Control measure - Firebreaks and fuel breaks

Control measure - Appropriate intervention: Fires in roofs

Control measure - Appropriate intervention: Thatched roof fires

Control measure - Appropriate intervention: Fires in roofs

Control measure - Firebreaks and fuel breaks

Control measure - Tactical planning – Damage control

Control measure - Implement firefighting contingency arrangements