Skip to main content

August 06, 2019

Control measure - Scene survey: Fires in buildings

All changes made following review requested by National Operational Learning. Changes made by panel of SME’s following review of available literature and approved by NFCC Steering Group on the 13th of February 2019.

Control measure - Situational awareness – Fires in buildings

All changes made following review requested by National Operational Learning. Changes made by panel of SME’s following review of available literature and approved by NFCC Steering Group on the 13th of February 2019.


March 27, 2019

Control measure - Situational awareness – Fires in buildings

All changes made following review requested by National Operational Learning. Changes made by panel of SME’s following review of available literature and approved by NFCC Steering Group on the 13th of February 2019.

Control measure - Scene survey: Fires in buildings

All changes made following review requested by National Operational Learning. Changes made by panel of SME’s following review of available literature and approved by NFCC Steering Group on the 13th of February 2019.


February 11, 2019

Control measure - ARCHIVE - Building systems and fixed installations

ARCHIVED - Duplicate of Building systems and fixed installations - TS - FIB (19606).

Control measure - Site-Specific Risk Information (SSRI)

Guidance link updated.


February 05, 2019

Control measure - Site-Specific Risk Information (SSRI)

Hyphen added to Site-Specific risk information


March 26, 2018

Control measure - Consider using thermal imaging or scanning


March 09, 2018

Control measure - Scene survey: Fires in buildings

Control measure - Building plans

Hazard - Inaccurate situational awareness – Fires in buildings

Control measure - Building systems and fixed installations

Control measure - Responsible person: Fires in buildings

Control measure - Situational awareness – Fires in buildings