Skip to main content

Developed and maintained by the NFCC

May 28, 2021

Control measure - Shoring

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021

Control measure - Shoring

Revised following approval of Height, structures and confined spaces. Second edition, version 1 by NFCC Steering Group 04/05/2021


August 05, 2019

Control measure - Shoring

Newly published Training Specification for Fires in Buildings under Construction or Demolition guidance. Content signed off by OGG on 8th of November 2017.

Control measure - Safe system of work: Unstable or collapsed excavations

The nature of the hazard requires specific control measures to mitigate or prevent harm.

Hazard - Unstable or collapsed excavations

Changes made as part of the Assurance project review. Changes to guidance and supporting changes to Training Specifications have been approved by the CPO board in September 2018. Training Spec amendments made by J Guthrie and M Hodges. Training lead B Powell has reviewed content.


January 31, 2019

Hazard - Unstable or collapsed excavations

Changes made as part of the Assurance project review. Changes to guidance and supporting changes to Training Specifications have been approved by the CPO board in September 2018. Training Spec amendments made by J Guthrie and M Hodges. Training lead B Powell has reviewed content.